loading loading

logo softshelter sidebar

softshelter journal 001 · preparing the workshop | 11/07/11

softshelter journal 02 softshelter journal 001 · preparing the workshop  |  11/07/11
David by the basin where a simple shower is being installed in the molo workshop

We are preparing the workshop in order to allow David, a member of the molo team to occupy softshelter, setup in molo’s workshop space.

softshelter journal 01 softshelter journal 001 · preparing the workshop  |  11/07/11

From David’s journal:

“Digging, fitting, pouring, fastening then connecting; all that’s left is to tie into the existing water system, and the workshop will have a shower where a bamboo shoot once stood. Excitement is building in anticipation of this unique experience”